Middle Creek Greenway is a multi-use trail that is made up of boardwalk, asphalt, and sidewalk connections. It is planned to provide a regional connection between Apex and Holly Springs, with 4.3 miles of paved surface connecting six neighborhoods, one retail center, and one employment center. It will also complete a safe pedestrian route to Lufkin Road Middle School, and will connect to Felton Grove High School in the future.
We recently added to this greenway! Click here for project details.
Greenway Details
- Projected Corridor Length: 5.25 to 6.4 miles depending on the alternative selected for the northern portion of the Corridor.
- Trail Width/Surface: 10-foot wide asphalt, boardwalk, sidewalk
- Used For: Walking, running, bicycling, walking leashed dogs, skating, roller blading, pushing strollers, wheelchairs
- Hours: Dawn to 30 minutes after sunset
- Connects To: Neighborhoods and commercial areas